01 September 2010
  • BLM thresholds
  • Quench tests
  • Direct dump BLM
  • Intensity ramp up September/October
  • Van der Meer scans
10 September 2010 CCC discussion involving the ABT experts (BG and JU), RA and JW on the limits for injection of trains.

We are presently in the situation that the injection protection is setup but not validated by loss maps (~ 100 loss maps to do because of the large number of phases and amplitudes).

The test of the crossing angle for injection requires injection of 8 bunches, which corresponds roughly to the limit of the setup beam for nominal bunches.

We agreed that a train of 8 bunches could be injected provided that:
- The injection was checked beforehand with an injection of 4 bunches (train).
- The 8 bunches are injected behind an already circulating train of 4 bunches.
15 September 2010
  • External review follow up
  • Intensity increase plan
  • VdM scans, TOTEM
28 September 2010
04 October 2010
07 October 2010
07 October 2010 Minutes to come
14 October 2010
20 October 2010
24 October 2010
26 October 2010